Whiteman’s Valley threw every rainy day they had in-store for the year at us for the duration of this project. This site was an ex-pine block which saw us removing over 300 stumps prior to earthworks commencing.

To successfully excavate the 1600m2 building platform, OCL needed to cut and fill a 6m bench and install a 100m steep access road. The platform was secured with an 80m engineered retaining wall and four 25,000l water tanks were installed.

Project scope

  • Wet weather conditions
  • 1000m2 platform
  • 6m cut and fill
  • 80m engineered retaining wall
  • Ex-pine block, 300 stumps removed prior to earthworks commencing 100m steep access road
  • Install of four 25,000l water tanks