Paraparaumu Arena
Jill contacted OCL to rescue arena works commenced by another contractor. The Maungatuks is a clay based soil area with poor natural soakage and an undulating landscape. To create this 50m x 25m equestrian arena we needed to cut and fill 1200t to achieve desired height. We installed an extensive novacoil drainage system and 1.5% fall to extend the longevity of the arena and make it suitable for riding in all weather. Jill’s arena was complete with a post and rail fencing.
Project scope
- 50m x 25m arena
- Novacoil drainage system installed and 1.5% fall created
- Post and rail fencing
- Riversand sourced from Horowhenua based quarries


“We are delighted with our new riding arena that Chay and his team constructed. They communicated well at all stages of the project and left everything neat and tidy when they finished. I would definitely use them for future projects.”
Jill, Paraparaumu